We Are Hiring

Do you want to join our dynamic and innovative team?

Read more…



News

 3rd Bridge Project in Istanbul, Turkey

3rd Bridge Project in Istanbul, Turkey

07 November 2013

KTI has delivered two sets of Concrete Cooling Equipment for the 3rd Bridge Project in Istanbul. These identical sets are placed on the European site as well as on the Anatolian site.

Each set-up of Concrete Cooling Equipment consist of a Cold Water Plant, Flake Ice Plant, Mobile Ice Storage and a Cold Water Tank.  
 
This prestigious infrastructure project officially started on 29th May 2013 with the ground breaking ceremony, which was held by the State President and the Prime Minister of Turkey.  
 
According to contractor Ictas Insaat the bridge will have the following features once finished in 2015:   
- The widest suspension bridge of the world with a width of 59 meters
- The longest suspension bridge of the world with a rail system of 1,048 meters
- A suspension bridge with the highest tower in the world with a height of 322 meters

 
 

Next